Trial Outcomes & Findings for Phase 2 Study of Safety, Efficacy, and Pharmacokinetics of Higher Doses of Daptomycin and Vancomycin in MRSA Bacteremia (NCT NCT00695903)
NCT ID: NCT00695903
Last Updated: 2018-12-24
Results Overview
Number of participants with treatment-emergent CPK elevations ≥5 x upper limit of normal (≥1,000 U/L) by the EOT visit.
TERMINATED
PHASE2
38 participants
On therapy and up to 3 days post-therapy (treatment duration ranged from 2 to 43 days)
2018-12-24
Participant Flow
Participant milestones
| Measure |
Daptomycin 10 mg/kg
Daptomycin 10 mg/kg Intravenously (IV) every 24 hours
|
Vancomycin High-dose
Vancomycin 15 mg/kg IV, dosed to maintain trough serum concentrations of 15 to 20 μg/mL
|
|---|---|---|
|
Had End of Therapy (EOT) Assessment
STARTED
|
19
|
19
|
|
Had End of Therapy (EOT) Assessment
Met Continuation Criteria
|
9
|
6
|
|
Had End of Therapy (EOT) Assessment
COMPLETED
|
7
|
4
|
|
Had End of Therapy (EOT) Assessment
NOT COMPLETED
|
12
|
15
|
|
Had Test of Cure (TOC) Assessment
STARTED
|
7
|
4
|
|
Had Test of Cure (TOC) Assessment
COMPLETED
|
5
|
3
|
|
Had Test of Cure (TOC) Assessment
NOT COMPLETED
|
2
|
1
|
Reasons for withdrawal
| Measure |
Daptomycin 10 mg/kg
Daptomycin 10 mg/kg Intravenously (IV) every 24 hours
|
Vancomycin High-dose
Vancomycin 15 mg/kg IV, dosed to maintain trough serum concentrations of 15 to 20 μg/mL
|
|---|---|---|
|
Had End of Therapy (EOT) Assessment
Randomized not treated
|
0
|
2
|
|
Had End of Therapy (EOT) Assessment
No confirmed MRSA
|
9
|
9
|
|
Had End of Therapy (EOT) Assessment
Adverse Event
|
1
|
0
|
|
Had End of Therapy (EOT) Assessment
Withdrawal by Subject
|
1
|
1
|
|
Had End of Therapy (EOT) Assessment
Physician Decision
|
0
|
1
|
|
Had End of Therapy (EOT) Assessment
Protocol Violation
|
1
|
2
|
|
Had Test of Cure (TOC) Assessment
Lack of Efficacy
|
1
|
0
|
|
Had Test of Cure (TOC) Assessment
Lost to Follow-up
|
1
|
0
|
|
Had Test of Cure (TOC) Assessment
Adverse Event
|
0
|
1
|
Baseline Characteristics
Phase 2 Study of Safety, Efficacy, and Pharmacokinetics of Higher Doses of Daptomycin and Vancomycin in MRSA Bacteremia
Baseline characteristics by cohort
| Measure |
Daptomycin 10 mg/kg
n=19 Participants
Daptomycin 10 mg/kg Intravenously (IV) every 24 hours
|
Vancomycin High-dose
n=17 Participants
Vancomycin 15 mg/kg IV, dosed to maintain trough serum concentrations of 15 to 20 μg/mL
|
Total
n=36 Participants
Total of all reporting groups
|
|---|---|---|---|
|
Age, Categorical
<=18 years
|
0 Participants
n=5 Participants
|
0 Participants
n=7 Participants
|
0 Participants
n=5 Participants
|
|
Age, Categorical
Between 18 and 65 years
|
16 Participants
n=5 Participants
|
15 Participants
n=7 Participants
|
31 Participants
n=5 Participants
|
|
Age, Categorical
>=65 years
|
3 Participants
n=5 Participants
|
2 Participants
n=7 Participants
|
5 Participants
n=5 Participants
|
|
Sex: Female, Male
Female
|
6 Participants
n=5 Participants
|
4 Participants
n=7 Participants
|
10 Participants
n=5 Participants
|
|
Sex: Female, Male
Male
|
13 Participants
n=5 Participants
|
13 Participants
n=7 Participants
|
26 Participants
n=5 Participants
|
PRIMARY outcome
Timeframe: On therapy and up to 3 days post-therapy (treatment duration ranged from 2 to 43 days)Population: All subjects who received at least one dose of study medication (Safety Population). Two patients in the high-dose vancomycin arm were randomized but not treated and therefore not included in the safety population.
Number of participants with treatment-emergent CPK elevations ≥5 x upper limit of normal (≥1,000 U/L) by the EOT visit.
Outcome measures
| Measure |
Daptomycin 10 mg/kg
n=19 Participants
Daptomycin 10 mg/kg Intravenously (IV) every 24 hours
|
Vancomycin High-dose
n=17 Participants
Vancomycin 15 mg/kg IV, dosed to maintain trough serum concentrations of 15 to 20 μg/mL
|
|---|---|---|
|
Number of Participants With Treatment-emergent Creatine Phosphokinase (CPK) Elevations
|
2 Participants
Interval 2.9 to 31.4
|
0 Participants
|
PRIMARY outcome
Timeframe: On therapy and up to 3 days post-therapy (treatment duration ranged from 2 to 43 days)Population: All subjects who received at least one dose of study medication (Safety Population). Two patients in the high-dose vancomycin arm were randomized but not treated and therefore not included in the safety population.
Number of participants with treatment-emergent serum creatinine increases ≥0.5 mg/dL (for patients with a baseline value ≤3.0 mg/dL) or ≥1.0 mg/dL (for patients with a baseline value \>3.0 mg/dL) by the EOT visit.
Outcome measures
| Measure |
Daptomycin 10 mg/kg
n=19 Participants
Daptomycin 10 mg/kg Intravenously (IV) every 24 hours
|
Vancomycin High-dose
n=17 Participants
Vancomycin 15 mg/kg IV, dosed to maintain trough serum concentrations of 15 to 20 μg/mL
|
|---|---|---|
|
Number of Participants With Elevated Serum Creatinine
|
0 participants
|
4 participants
Interval 9.6 to 47.3
|
SECONDARY outcome
Timeframe: End of Therapy (median day 12 and 6.5 in daptomycin and vancomycin modified intent-to treat population, respectively)Population: Patients who met the continuation criteria (modified intent-to-treat) and had a EOT assessment of clinical outcome.
Investigator's assessment of treatment cure. Treatment Cure includes successful outcomes of both clinical and microbiological assessments. Clinical cure is defined by clinical improvement of symptoms and signs associated with the underlying infection such that no further anti-infective therapy is required. Microbiological Success is defined by the eradication or presumed eradication of baseline infecting methicillin-resistant S. aureus pathogen and no superinfecting pathogen(s) (Gram-positive) or metastatic methicillin-resistant S. aureus pathogens were isolated post therapy.
Outcome measures
| Measure |
Daptomycin 10 mg/kg
n=7 Participants
Daptomycin 10 mg/kg Intravenously (IV) every 24 hours
|
Vancomycin High-dose
n=4 Participants
Vancomycin 15 mg/kg IV, dosed to maintain trough serum concentrations of 15 to 20 μg/mL
|
|---|---|---|
|
Number of Participants With Treatment Cure at End of Therapy (EOT) Visit
|
6 participants
Interval 48.7 to 97.4
|
3 participants
Interval 30.1 to 95.4
|
SECONDARY outcome
Timeframe: Test of Cure (TOC) Visit (35 to 49 days post-therapy, approximately week 8)Population: Subset of modified intent-to-treat population who completed TOC/Safety visit
Investigator's assessment of clinical response. Treatment Cure includes successful outcomes of both clinical and microbiological assessments. Clinical cure is defined by clinical improvement of symptoms and signs associated with the underlying infection such that no further anti-infective therapy is required. Microbiological Success is defined by the eradication or presumed eradication of baseline infecting methicillin-resistant S. aureus pathogen and no superinfecting pathogen(s) (Gram-positive) or metastatic methicillin-resistant S. aureus pathogens were isolated post therapy.
Outcome measures
| Measure |
Daptomycin 10 mg/kg
n=5 Participants
Daptomycin 10 mg/kg Intravenously (IV) every 24 hours
|
Vancomycin High-dose
n=3 Participants
Vancomycin 15 mg/kg IV, dosed to maintain trough serum concentrations of 15 to 20 μg/mL
|
|---|---|---|
|
Number of Participants With Treatment Cure at Test of Cure (TOC)/Safety Visit
|
5 participants
Interval 56.6 to 100.0
|
3 participants
Interval 43.9 to 100.0
|
Adverse Events
Daptomycin
Vancomycin
Serious adverse events
| Measure |
Daptomycin
n=19 participants at risk
Daptomycin 10 mg/kg i.v.q24hr
|
Vancomycin
n=17 participants at risk
Vancomycin 15 mg/kg i.v., dosed to maintain trough serum concentrations of 15 to 20 ug/mL
|
|---|---|---|
|
Cardiac disorders
Atrioventricular block complete
|
5.3%
1/19 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
0.00%
0/17 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
Congenital, familial and genetic disorders
Atrial septal defect
|
5.3%
1/19 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
0.00%
0/17 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
Gastrointestinal disorders
Abdominal pain
|
5.3%
1/19 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
0.00%
0/17 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
Gastrointestinal disorders
Diarrhoea
|
10.5%
2/19 • Number of events 2 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
0.00%
0/17 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
Gastrointestinal disorders
Nausea
|
5.3%
1/19 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
0.00%
0/17 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
Gastrointestinal disorders
Pancreatitis acute
|
5.3%
1/19 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
0.00%
0/17 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
Gastrointestinal disorders
Vomiting
|
5.3%
1/19 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
0.00%
0/17 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
Infections and infestations
Endocarditis bacterial
|
0.00%
0/19 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
5.9%
1/17 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
Infections and infestations
Osteomyelitis
|
0.00%
0/19 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
5.9%
1/17 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
Renal and urinary disorders
Renal failure
|
0.00%
0/19 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
5.9%
1/17 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
Renal and urinary disorders
Renal failure acute
|
0.00%
0/19 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
5.9%
1/17 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
Respiratory, thoracic and mediastinal disorders
Pulmonary embolism
|
5.3%
1/19 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
0.00%
0/17 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
Other adverse events
| Measure |
Daptomycin
n=19 participants at risk
Daptomycin 10 mg/kg i.v.q24hr
|
Vancomycin
n=17 participants at risk
Vancomycin 15 mg/kg i.v., dosed to maintain trough serum concentrations of 15 to 20 ug/mL
|
|---|---|---|
|
Eye disorders
Diplopia
|
5.3%
1/19 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
0.00%
0/17 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
Eye disorders
Photophobia
|
5.3%
1/19 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
0.00%
0/17 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
Gastrointestinal disorders
Abdominal discomfort
|
0.00%
0/19 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
5.9%
1/17 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
Gastrointestinal disorders
Constipation
|
0.00%
0/19 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
5.9%
1/17 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
Gastrointestinal disorders
Diarrhoea
|
5.3%
1/19 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
0.00%
0/17 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
Gastrointestinal disorders
Nausea
|
0.00%
0/19 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
5.9%
1/17 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
General disorders
Catheter related complication
|
0.00%
0/19 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
5.9%
1/17 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
General disorders
Catheter site discharge
|
5.3%
1/19 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
0.00%
0/17 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
General disorders
Catheter site erythema
|
5.3%
1/19 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
0.00%
0/17 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
General disorders
Catheter site haemorrhage
|
5.3%
1/19 • Number of events 2 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
0.00%
0/17 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
General disorders
Catheter site oedema
|
5.3%
1/19 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
0.00%
0/17 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
General disorders
Catheter site pain
|
5.3%
1/19 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
0.00%
0/17 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
General disorders
Catheter site related reaction
|
5.3%
1/19 • Number of events 3 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
0.00%
0/17 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
General disorders
Pain
|
5.3%
1/19 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
0.00%
0/17 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
Infections and infestations
Pneumonia bacterial
|
0.00%
0/19 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
5.9%
1/17 • Number of events 2 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
Infections and infestations
Urinary tract infection bacterial
|
0.00%
0/19 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
5.9%
1/17 • Number of events 2 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
Infections and infestations
Vulvovaginal mycotic infection
|
5.3%
1/19 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
0.00%
0/17 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
Investigations
Blood creatine phosphokinase increased
|
10.5%
2/19 • Number of events 2 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
0.00%
0/17 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
Metabolism and nutrition disorders
Hyperphosphataemia
|
0.00%
0/19 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
5.9%
1/17 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
Metabolism and nutrition disorders
Hypocalcaemia
|
0.00%
0/19 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
5.9%
1/17 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
Metabolism and nutrition disorders
Hypoglycaemia
|
0.00%
0/19 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
5.9%
1/17 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
Metabolism and nutrition disorders
Hypomagnesaemia
|
5.3%
1/19 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
11.8%
2/17 • Number of events 2 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
Musculoskeletal and connective tissue disorders
Back pain
|
0.00%
0/19 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
5.9%
1/17 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
Musculoskeletal and connective tissue disorders
Neck pain
|
5.3%
1/19 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
0.00%
0/17 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
Musculoskeletal and connective tissue disorders
Pain in extremity
|
5.3%
1/19 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
0.00%
0/17 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
Nervous system disorders
Headache
|
5.3%
1/19 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
5.9%
1/17 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
Nervous system disorders
Hypoaesthesia
|
5.3%
1/19 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
0.00%
0/17 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
Nervous system disorders
Paraesthesia
|
5.3%
1/19 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
0.00%
0/17 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
Renal and urinary disorders
Renal failure acute
|
0.00%
0/19 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
5.9%
1/17 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
Skin and subcutaneous tissue disorders
Pruritus
|
0.00%
0/19 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
5.9%
1/17 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
Skin and subcutaneous tissue disorders
Rash
|
0.00%
0/19 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
11.8%
2/17 • Number of events 2 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
Skin and subcutaneous tissue disorders
Skin exfoliation
|
0.00%
0/19 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
5.9%
1/17 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
|
Vascular disorders
Hypertension
|
0.00%
0/19 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
5.9%
1/17 • Number of events 1 • Safety assessments were performed throughout the study (an average of 8 weeks). Safety assessments were conducted at the EOT/Early Termination visit (on the day of or within 3 days after therapy was stopped) and TOC visit (35 to 49 days post-therapy).
On therapy safety assessments included maximum daily temperature, vital signs, physical examination and clinical laboratory tests. Investigators were required to report lab abnormalities (e.g. CPK, serum creatinine) as adverse events only when he/she considered the abnormality clinically significant.
|
Additional Information
Results disclosure agreements
- Principal investigator is a sponsor employee The first publication is initiated by Cubist. If first publication not published within 1 year of study conclusion or termination, Investigator has right to publish and disclose the data. Prior to any submission for publication, presentation, or communication of results or information arising from the study, Investigator shall provide Cubist at least 90 days for review and comment upon the manuscript or other material for such publication or presentation.
- Publication restrictions are in place
Restriction type: OTHER